PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Fixing the pour stop at the 4th Floor East Elevation  (1).jpg Fixing the pour stop at the 4th Floor East Elevation  (2).jpg Concrete Planks for the Detention Cells (1).jpg Concrete Planks for the Detention Cells (2).jpg Continued layout block at the Detention Cells (1st Floor) Facing East.jpg Installed a steel post at the 4th floor North Elevation.jpg
Previous pageNext page Fixing the pour stop at the 4th Floor East Elevation  (2)
Fixing the pour stop at the 4th Floor East Elevation (2)